Leapay three layers electric -gas deck baking oven

Click to view the original image
 
Brand: Leapay
Unit Price: 920.00USD/set
Min.Order: 1 set
Supply: 100 set
Delivery: Shipment within 20 days since the date of payment
Address: Guangdong Guangzhou
Valid until: Never Expire
Updated on: 2019-08-28 10:43
Hits: 121
 
Company Details






Details
Product Description

PRODUCT PERFORMANCE
•All stainless steel outside, suitable for shopping malls, supermarkets, freshly baked store and so on
•Suitable for baking cake, moon cake, bread, green bean cake, pastries and almost baking products. Baked product layering, no deformation, uniform color, bright, less water loss, the overall baking results.

普及型燃气烤炉
SPECIFICATIONS FOR GAS OVEN
Model
Capacity
power supply/ Tray size(mm)
Voltage &Power
(V/W)
N.W/G.W(KG)
Machine size (cm)
10G
1 deck 1 tray
gas,400x600
220V/100w
78/108
88*96*54
20G
1 deck 2 trays
gas,400x600
220V/100w
130/158
137*98*72
40G
2 deck 4 trays
gas,400x600
220V/200w
230/263
137*98*155
60G
3 deck 6 trays
gas,400x600
220V/300w
320/360
137*98*180
90G
3 deck 9 trays
gas,400x600
220V/300w
385/455
178*98*180

Detailed Images

 

Two control panels. The temperature controller is button dual-screen display and double cost of the common temperature controller. The advantages are accurate temperature control, intuitive, easy to operate, etc.

 

We add the door seal rubber for all of the deck ovens which can effectively prevent the furnace heat loss, to ensure that the furnace temperature uniformity.

 

Unique design of chamber and the place of burner tube to achieve uniform temperature, baking out the product color uniformity. Do not exchange the trays from inside to outside during the baking.

 

We thicken the temperature insulation layer, insulation effect is better and save energy.

 

Unique skeleton reinforcement design of the chamber, reducing the high temperature deformation of the chamber caused by the upper and lower fire string temperature problems, while ensuring the baking product uniformity and stability

 

The chamber of our deck ovens are made of high quality aluminum alloy plate production, in line with national food inspection requirements.

 

Our burner tube made of stainless steel to ensure that users use a long time, there will be no rust into the food.

 

All outside in enough thickness stainless steel 430.

 

Bigger glass window, there are no welding place on the front.

Packing & Delivery
Packaging
Size
124 (L) * 82 (W) * 160 (D)
Weight
550kg
 
 
 
Packaging Details
The normal package is plywood case(Size: L*W*H).If container is too tigher,we will use pe film for packing or pack it according to customers special request.
Warm Tips

1. keep the machine working in a clean surrounding and clean it regularly.
2. don't let solids mix into the bowl, the machine will be stucked ( even it have protective device,it may harm to the machine). 
3. people need rest, so does the machine, do not keep the machine working stopless for a long time. 
4. check the gear box regularly, once the lubricating oil is not enough,add it. its important, if you do not want to pay for new gear. 
5.If you are not skilled man, it is better let the technician repair the machine.

Our Service

Pre-Sales Service

1.Advice for equipment device
2.Customization is supplied depend on your demand
3.The voltage can be changed according to your choice
4.Relative market information and your inquiry is timely replied within 5 hours.

After-Sales Service

1. Whole life's technical consultant of the machine.
2.Site-repair is offered when it necessary
3.Spare parts are provided of some machines
4. 12 months warranty, lifelong service and technical support. 

FAQ

Q1.What Methods of Payment Are Acceptable? 
1. Telegraphic Transfer (T/T): we accept 30% T/T deposit before production and 70% T/T Balance before shipment. 100% payment for sample orders. 
2. Western Union: we accept 100% payment via the western union. 
3. Letter of Credit (L/C): we accept 100% L/C irrevocable at sight. 

Q2. What Is the Cost of Shipping? 
Shipping cost is based on the following elements: 

1.Number of packages 2. Gross Weight 3. Package CBM 4. Destination port 
We can arrange shipping for you , if you have shipping agent in China , we can send goods to your warehouse . 

Q3. How about the Delivery Time? 
Some of the products are in stock at our warehouse, generally we need 3~5 days to change the plugs before the delivery. Regarding to the non-stock products, the lead time 15-30 days depends on your requirement on the product. 

Our Company
Certifications
Send your message to this supplier
* Inquiry Title
* Message
Contact Details Not a member? Please Sign up or leave your contact details  Already a member? Please Sign in
Company
* True Name
* Telephone
* E-mail
Facebook
Whatsapp
WeChat
More>Our Others Products